
Первая бригада может выполнить работу за 8 часов, а вторая в 1 7/8 раза медленнее. За сколько
часов могут выполнить работу обе бригады, работая вместе?

Ответы на вопрос

Ответ:
Пошаговое объяснение:
вторая бригада за 8×1 7/8=8×15/8=
=15часов .Пусть весь обьем работ
=1 находим сумму производительности труда
1/8 +1/15 =23/120
если будут работать вместе то,
1÷23/120= 120/23 =5 5/23часа



Calculating the Combined Work Time of Two Crews
To calculate the combined work time of both crews, we can use the concept of "work done equals rate multiplied by time."
Let's denote: - T1 as the time taken by the first crew to complete the work - T2 as the time taken by the second crew to complete the work - R2 as the rate of the second crew (which is 1 7/8 times slower than the first crew)
We know that the first crew can complete the work in 8 hours, and the second crew is 1 7/8 times slower.
Using the formula: Total work = Work done by the first crew + Work done by the second crew
We can express the work done by the second crew in terms of the work done by the first crew: Work done by the second crew = (1/1 7/8) * Work done by the first crew
Now, we can calculate the combined work time of both crews.
Step 1: Calculate the work rate of the second crew. Step 2: Use the work rates to find the combined work time of both crews.
Step 1: Calculate the Work Rate of the Second Crew
The work rate of the second crew can be calculated using the given information that it is 1 7/8 times slower than the first crew.The work rate of the second crew = 1 / (1 7/8) * (work rate of the first crew)
Step 2: Calculate the Combined Work Time of Both Crews
The combined work time can be calculated using the work rates of both crews.Combined work time = Total work / (Work rate of the first crew + Work rate of the second crew)
Let's calculate the combined work time using the given information.
Solution
The work rate of the second crew = 1 / (1 7/8) * (1 job / 8 hours) = 8 / 15 job per hour.Now, we can calculate the combined work time: Combined work time = 1 job / (1 job / 8 hours + 8 / 15 job per hour) = 1 job / (23 / 15 job per hour) = 15 / 23 hours.
Therefore, the combined work time of both crews, working together, is 15/23 hours.


Похожие вопросы
Топ вопросов за вчера в категории Математика





Последние заданные вопросы в категории Математика
-
Математика
-
Литература
-
Алгебра
-
Русский язык
-
Геометрия
-
Английский язык
-
Химия
-
Физика
-
Биология
-
Другие предметы
-
История
-
Обществознание
-
Окружающий мир
-
География
-
Українська мова
-
Информатика
-
Українська література
-
Қазақ тiлi
-
Экономика
-
Музыка
-
Право
-
Беларуская мова
-
Французский язык
-
Немецкий язык
-
МХК
-
ОБЖ
-
Психология
-
Физкультура и спорт
-
Астрономия
-
Кыргыз тили
-
Оʻzbek tili