Exercise 3. Choose the correct answer in the following. 1. Recent faults with machines have cost

the company a great deal of __. a) maintenance b) slack time c) downtime 2. Once the mock-up of the new design has been tested, we can build the ____. a) prototype b) update c) set up 3. It's unprofitable to manufacture small quantities because of the machine___. a) lead time b) set-up time c) sequence 4 The production manager has to produce a production______ for the next four weeks. a) set up b) schedule c) output 5. Once the order has been agreed and production begun, the designer is still responsible for the_______. a) work in progress b) workload c) back order 6. These items are produced together as one _____________. a) cycle b) delivery c) lot
0 0
Перейти к ответам

Ответы на вопрос

Внимание! Ответы на вопросы дают живые люди. Они могут содержать ошибочную информацию, заблуждения, а также ответы могут быть сгенерированы нейросетями. Будьте внимательны. Если вы уверены, что ответ неверный, нажмите кнопку "Пожаловаться" под ответом.
Отвечает Кривич Алексей.

Ответ:

Exercise 3. Choose the correct answer in the following.

1. Recent faults with machines have cost the company a great deal of downtime.

a) maintenance b) slack time c) downtime

2. Once the mock-up of the new design has been tested, we can build the prototype.

a) prototype b) update c) set up

3. It's unprofitable to manufacture small quantities because of the machine lead time.

a) lead time b) set-up time c) sequence

4 The production manager has to produce a production schedule for the next four weeks.

a) set up b) schedule c) output

5. Once the order has been agreed and production begun, the designer is still responsible for the back order.

a) work in progress b) workload c) back order

6. These items are produced together as one lot.

a) cycle b) delivery c) lot

0 0
Отвечает нейросеть ChatGpt. Будьте внимательны, ответы нейросети могут содержать ошибочные или выдуманные данные.
  1. Recent faults with machines have cost the company a great deal of __. Correct answer: c) downtime

  2. Once the mock-up of the new design has been tested, we can build the ____ Correct answer: a) prototype

  3. It's unprofitable to manufacture small quantities because of the machine___. Correct answer: b) set-up time

  4. The production manager has to produce a production______ for the next four weeks. Correct answer: b) schedule

  5. Once the order has been agreed and production begun, the designer is still responsible for the_______. Correct answer: a) work in progress

  6. These items are produced together as one _____________. Correct answer: c) lot